Orange Creek at Orange Springs

Highest listed crest 29.32 ftFlood stage 25.5 ft190 crests since 1941

The Orange Creek at Orange Springs crested at major flood stage 5 times among the 190 crests the National Weather Service lists from 1941 to 2024. The highest, 29.32 ft on October 20, 1941, was major flooding, 3.82 feet above flood stage.

The gauge

Highest listed crest
29.32 ft
October 20, 1941; 2,400 cubic feet per second
Flood stage
25.5 ft
Major flooding from 27.5 ft
Crests at major
5
39th of 237 gauges in Florida
Most recent flood crest
October 10, 2024
25.65 ft, minor flooding
Location
Marion County
Florida

Flood stages

The thresholds the National Weather Service uses for this gauge today, and how many listed crests reached each.

Flood categories, Orange Creek at Orange Springs
Action stage24.0108Mar 18, 2014The level at which the NWS or its partners begin to take action
Flood stage (minor)25.552Oct 10, 2024Minimal or no property damage, but possibly some public threat
Moderate flood stage26.525Jul 23, 2018Some inundation of structures and roads near the stream
Major flood stage27.55Sep 11, 2017Extensive inundation of structures and roads

Every listed crest

190 crests from 1941 to 2024. Filled: at or above flood stage. Hover a crest for its date and stage.

Listed crests at the Orange Creek at Orange Springs, 1941 to 2024 24262830ft Flood stage 25.5 ftMajor 27.5 ft Oct 20, 1941: 29.32 ft, major flooding; 2,400 cubic feet per secondNov 16, 1941: 27.73 ft, major flooding; 1,490 cubic feet per secondDec 19, 1941: 26.47 ft, minor flooding; 761 cubic feet per secondJan 20, 1942: 26.14 ft, minor flooding; 616 cubic feet per secondFeb 25, 1942: 26.25 ft, minor flooding; 613 cubic feet per secondApr 3, 1942: 26.40 ft, minor flooding; 743 cubic feet per secondSep 8, 1943: 26.37 ft, minor flooding; 775 cubic feet per secondApr 4, 1944: 25.02 ft, action stage; 310 cubic feet per secondOct 19, 1944: 26.42 ft, minor flooding; 800 cubic feet per secondAug 28, 1945: 24.02 ft, action stage; 150 cubic feet per secondSep 28, 1945: 24.06 ft, action stage; 155 cubic feet per secondDec 29, 1945: 25.93 ft, minor flooding; 593 cubic feet per secondFeb 1, 1946: 24.62 ft, action stage; 225 cubic feet per secondMar 25, 1946: 24.11 ft, action stage; 153 cubic feet per secondJul 29, 1946: 26.04 ft, minor flooding; 638 cubic feet per secondAug 27, 1946: 26.42 ft, minor flooding; 860 cubic feet per secondSep 25, 1946: 26.56 ft, moderate flooding; 870 cubic feet per secondOct 29, 1946: 26.30 ft, minor flooding; 754 cubic feet per secondDec 6, 1946: 25.42 ft, action stage; 408 cubic feet per secondJan 2, 1947: 24.74 ft, action stage; 241 cubic feet per secondJan 28, 1947: 24.17 ft, action stage; 164 cubic feet per secondFeb 25, 1947: 24.04 ft, action stage; 155 cubic feet per secondMar 27, 1947: 24.94 ft, action stage; 286 cubic feet per secondMay 6, 1947: 24.43 ft, action stageJul 3, 1947: 24.24 ft, action stage; 190 cubic feet per secondAug 27, 1947: 24.10 ft, action stage; 169 cubic feet per secondSep 24, 1947: 26.86 ft, moderate flooding; 1,030 cubic feet per secondOct 7, 1947: 25.31 ft, action stage; 379 cubic feet per secondNov 6, 1947: 25.78 ft, minor flooding; 523 cubic feet per secondDec 4, 1947: 25.92 ft, minor flooding; 576 cubic feet per secondJan 8, 1948: 25.40 ft, action stage; 376 cubic feet per secondFeb 2, 1948: 26.18 ft, minor flooding; 688 cubic feet per secondMar 11, 1948: 27.44 ft, moderate flooding; 1,340 cubic feet per secondMar 31, 1948: 26.80 ft, moderate flooding; 1,030 cubic feet per secondApr 27, 1948: 26.01 ft, minor flooding; 638 cubic feet per secondMay 24, 1948: 24.80 ft, action stage; 266 cubic feet per secondJul 29, 1948: 24.81 ft, action stage; 283 cubic feet per secondSep 2, 1948: 25.47 ft, action stage; 454 cubic feet per secondSep 29, 1948: 25.16 ft, action stage; 310 cubic feet per secondOct 4, 1948: 26.76 ft, moderate flooding; 974 cubic feet per secondOct 28, 1948: 25.55 ft, minor flooding; 467 cubic feet per secondDec 2, 1948: 25.10 ft, action stage; 315 cubic feet per secondDec 30, 1948: 24.86 ft, action stage; 276 cubic feet per secondFeb 4, 1949: 24.40 ft, action stage; 195 cubic feet per secondMar 3, 1949: 24.10 ft, action stage; 168 cubic feet per secondAug 31, 1949: 25.02 ft, action stage; 316 cubic feet per secondSep 28, 1949: 24.66 ft, action stage; 226 cubic feet per secondNov 2, 1949: 24.42 ft, action stage; 198 cubic feet per secondDec 1, 1949: 24.30 ft, action stage; 169 cubic feet per secondSep 7, 1950: 27.25 ft, moderate flooding; 1,240 cubic feet per secondSep 28, 1950: 25.70 ft, minor flooding; 511 cubic feet per secondOct 21, 1950: 26.88 ft, moderate flooding; 1,040 cubic feet per secondNov 1, 1950: 26.03 ft, minor flooding; 561 cubic feet per secondNov 29, 1950: 25.46 ft, action stage; 347 cubic feet per secondDec 27, 1950: 24.71 ft, action stage; 226 cubic feet per secondFeb 5, 1951: 24.14 ft, action stage; 156 cubic feet per secondOct 2, 1951: 26.12 ft, minor flooding; 655 cubic feet per secondDec 12, 1951: 24.34 ft, action stage; 194 cubic feet per secondJan 24, 1952: 24.10 ft, action stage; 149 cubic feet per secondMar 6, 1952: 25.22 ft, action stage; 345 cubic feet per secondApr 16, 1952: 24.74 ft, action stage; 250 cubic feet per secondOct 17, 1956: 24.87 ft, action stageJun 13, 1957: 24.10 ft, action stageAug 10, 1957: 25.00 ft, action stageSep 21, 1957: 25.84 ft, minor flooding; 538 cubic feet per secondMar 10, 1958: 24.87 ft, action stageApr 10, 1958: 25.09 ft, action stage; 354 cubic feet per secondJul 6, 1958: 24.40 ft, action stageMar 20, 1959: 26.79 ft, moderate flooding; 1,020 cubic feet per secondMay 1, 1959: 26.02 ft, minor flooding; 638 cubic feet per secondJun 21, 1959: 26.39 ft, minor floodingJul 14, 1959: 26.59 ft, moderate floodingAug 20, 1959: 25.63 ft, minor flooding; 496 cubic feet per secondSep 13, 1959: 26.50 ft, moderate floodingOct 16, 1959: 25.41 ft, action stage; 398 cubic feet per secondDec 16, 1959: 24.09 ft, action stage; 150 cubic feet per secondMar 18, 1960: 27.24 ft, moderate flooding; 1,230 cubic feet per secondJun 1, 1960: 24.10 ft, action stage; 176 cubic feet per secondAug 7, 1960: 26.27 ft, minor floodingSep 12, 1960: 26.96 ft, moderate flooding; 1,020 cubic feet per secondOct 9, 1960: 26.77 ft, moderate flooding; 880 cubic feet per secondNov 1, 1960: 26.50 ft, moderate flooding; 840 cubic feet per secondNov 11, 1960: 26.00 ft, minor flooding; 588 cubic feet per secondDec 28, 1960: 25.24 ft, action stage; 346 cubic feet per secondFeb 21, 1961: 24.90 ft, action stage; 287 cubic feet per secondSep 13, 1961: 25.15 ft, action stage; 320 cubic feet per secondJul 19, 1962: 24.25 ft, action stage; 202 cubic feet per secondJul 25, 1963: 24.17 ft, action stage; 191 cubic feet per secondJan 28, 1964: 24.70 ft, action stage; 225 cubic feet per secondMar 12, 1964: 25.89 ft, minor flooding; 576 cubic feet per secondMar 23, 1964: 25.38 ft, action stage; 367 cubic feet per secondMay 18, 1964: 24.04 ft, action stage; 174 cubic feet per secondSep 13, 1964: 28.58 ft, major flooding; 2,170 cubic feet per secondNov 4, 1964: 25.98 ft, minor flooding; 573 cubic feet per secondDec 15, 1964: 25.27 ft, action stage; 326 cubic feet per secondFeb 3, 1965: 25.25 ft, action stage; 361 cubic feet per secondApr 26, 1965: 24.68 ft, action stage; 264 cubic feet per secondJul 14, 1965: 24.59 ft, action stage; 258 cubic feet per secondAug 8, 1965: 26.63 ft, moderate flooding; 985 cubic feet per secondAug 30, 1965: 26.28 ft, minor flooding; 816 cubic feet per secondOct 14, 1965: 25.44 ft, action stage; 442 cubic feet per secondNov 23, 1965: 24.52 ft, action stage; 225 cubic feet per secondJan 12, 1966: 24.17 ft, action stage; 183 cubic feet per secondMar 1, 1966: 26.13 ft, minor flooding; 735 cubic feet per secondApr 12, 1966: 25.05 ft, action stage; 353 cubic feet per secondSep 16, 1966: 25.38 ft, action stage; 464 cubic feet per secondOct 25, 1966: 25.22 ft, action stage; 389 cubic feet per secondMar 2, 1967: 25.05 ft, action stage; 357 cubic feet per secondAug 30, 1967: 26.58 ft, moderate flooding; 960 cubic feet per secondSep 28, 1967: 24.12 ft, action stage; 189 cubic feet per secondAug 30, 1968: 24.90 ft, action stage; 306 cubic feet per secondOct 19, 1968: 25.49 ft, action stage; 481 cubic feet per secondNov 18, 1968: 24.84 ft, action stage; 287 cubic feet per secondMar 24, 1969: 24.43 ft, action stage; 239 cubic feet per secondOct 7, 1969: 24.64 ft, action stage; 246 cubic feet per secondDec 2, 1969: 24.30 ft, action stage; 204 cubic feet per secondJan 16, 1970: 25.60 ft, minor flooding; 507 cubic feet per secondFeb 3, 1970: 27.41 ft, moderate flooding; 1,410 cubic feet per secondMay 1, 1970: 25.90 ft, minor flooding; 684 cubic feet per secondSep 21, 1970: 24.60 ft, action stage; 274 cubic feet per secondFeb 8, 1971: 24.83 ft, action stage; 328 cubic feet per secondAug 29, 1972: 24.78 ft, action stage; 279 cubic feet per secondMay 29, 1973: 24.44 ft, action stage; 249 cubic feet per secondSep 23, 1974: 24.91 ft, action stage; 365 cubic feet per secondAug 18, 1978: 26.80 ft, moderate flooding; 1,100 cubic feet per secondMay 8, 1979: 24.33 ft, action stage; 226 cubic feet per secondJan 27, 1980: 25.17 ft, action stage; 405 cubic feet per secondFeb 11, 1980: 24.08 ft, action stage; 236 cubic feet per secondApr 16, 1980: 24.00 ft, action stage; 206 cubic feet per secondFeb 20, 1981: 24.65 ft, action stage; 280 cubic feet per secondApr 12, 1982: 25.55 ft, minor flooding; 511 cubic feet per secondJun 18, 1982: 26.63 ft, moderate flooding; 1,000 cubic feet per secondAug 11, 1982: 24.70 ft, action stage; 333 cubic feet per secondSep 29, 1982: 24.72 ft, action stage; 329 cubic feet per secondMar 14, 1983: 24.29 ft, action stage; 242 cubic feet per secondMay 5, 1983: 25.77 ft, minor flooding; 620 cubic feet per secondJun 8, 1983: 26.20 ft, minor flooding; 788 cubic feet per secondJan 4, 1984: 24.52 ft, action stage; 290 cubic feet per secondFeb 16, 1984: 24.17 ft, action stage; 243 cubic feet per secondFeb 28, 1984: 25.45 ft, action stage; 529 cubic feet per secondApr 11, 1984: 24.94 ft, action stage; 380 cubic feet per secondAug 1, 1984: 24.06 ft, action stage; 224 cubic feet per secondSep 1, 1985: 24.56 ft, action stage; 303 cubic feet per secondMar 15, 1986: 25.80 ft, minor flooding; 639 cubic feet per secondMar 9, 1987: 24.79 ft, action stage; 326 cubic feet per secondMar 31, 1987: 26.74 ft, moderate flooding; 1,010 cubic feet per secondMay 20, 1987: 24.90 ft, action stage; 337 cubic feet per secondSep 30, 1988: 25.14 ft, action stage; 440 cubic feet per secondJun 6, 1991: 24.35 ft, action stage; 270 cubic feet per secondOct 4, 1992: 25.50 ft, minor flooding; 537 cubic feet per secondOct 15, 1995: 24.25 ft, action stage; 265 cubic feet per secondDec 30, 1997: 25.24 ft, action stage; 455 cubic feet per secondFeb 23, 1998: 28.10 ft, major flooding; 1,660 cubic feet per secondApr 14, 1998: 25.67 ft, minor flooding; 609 cubic feet per secondOct 1, 1998: 25.45 ft, action stage; 490 cubic feet per secondSep 15, 2001: 24.55 ft, action stage; 285 cubic feet per secondAug 4, 2003: 24.71 ft, action stage; 312 cubic feet per secondSep 7, 2004: 27.36 ft, moderate flooding; 1,210 cubic feet per secondSep 27, 2004: 26.80 ft, moderate flooding; 887 cubic feet per secondOct 4, 2004: 27.45 ft, moderate flooding; 1,250 cubic feet per secondJul 13, 2005: 25.27 ft, action stage; 430 cubic feet per secondFeb 4, 2006: 25.17 ft, action stage; 407 cubic feet per secondFeb 2, 2007: 24.76 ft, action stage; 310 cubic feet per secondAug 23, 2008: 25.27 ft, action stage; 405 cubic feet per secondMay 24, 2009: 24.55 ft, action stage; 280 cubic feet per secondJun 25, 2012: 24.83 ft, action stage; 317 cubic feet per secondAug 22, 2012: 25.19 ft, action stage; 387 cubic feet per secondSep 22, 2012: 24.37 ft, action stage; 245 cubic feet per secondJul 3, 2013: 24.08 ft, action stage; 207 cubic feet per secondDec 15, 2013: 25.39 ft, action stage; 436 cubic feet per secondMar 18, 2014: 24.90 ft, action stage; 330 cubic feet per secondSep 16, 2015: 25.79 ft, minor flooding; 552 cubic feet per secondSep 26, 2015: 25.74 ft, minor flooding; 537 cubic feet per secondSep 11, 2017: 28.79 ft, major flooding; 2,500 cubic feet per secondSep 21, 2017: 27.43 ft, moderate flooding; 1,420 cubic feet per secondOct 17, 2017: 25.90 ft, minor flooding; 655 cubic feet per secondApr 10, 2018: 26.09 ft, minor flooding; 670 cubic feet per secondJun 1, 2018: 26.33 ft, minor flooding; 764 cubic feet per secondJun 20, 2018: 25.78 ft, minor flooding; 564 cubic feet per secondJul 9, 2018: 26.28 ft, minor flooding; 744 cubic feet per secondJul 23, 2018: 26.70 ft, moderate flooding; 931 cubic feet per secondAug 3, 2018: 25.75 ft, minor flooding; 555 cubic feet per secondAug 11, 2018: 25.60 ft, minor flooding; 510 cubic feet per secondDec 15, 2018: 25.91 ft, minor flooding; 607 cubic feet per secondDec 20, 2018: 26.21 ft, minor flooding; 716 cubic feet per secondJan 5, 2019: 25.63 ft, minor flooding; 519 cubic feet per secondJan 28, 2019: 25.80 ft, minor flooding; 571 cubic feet per secondAug 4, 2021: 25.53 ft, minor floodingSep 20, 2021: 25.78 ft, minor flooding; 563 cubic feet per secondOct 10, 2024: 25.65 ft, minor flooding; 516 cubic feet per second Highest, 29.32 ft, Oct 20, 1941 1960198020002020

Crests at or above flood stage, by decade

Crests at or above flood stage per decade, Orange Creek at Orange Springs 1940s: 22 22 1950s: 12 1960s: 13 1970s: 4 1980s: 6 1990s: 3 2000s: 3 2010s: 16 2020s: 3 1940s1950s1960s1970s1980s1990s2000s2010s2020s
  1. These are the crests the local National Weather Service office lists for the gauge: the highest on record and recent crests. Lesser floods between them may be missing, so counts by decade are a floor.
  2. Categories use today's flood stages. Levees, dams and channel changes since a crest can make old and new stages not directly comparable.

Highest crests

The 50 highest of 190 listed crests.

Highest listed crests, Orange Creek at Orange Springs
1Oct 20, 194129.32+3.82Major2,400
2Sep 11, 201728.79+3.29Major2,500
3Sep 13, 196428.58+3.08Major2,170
4Feb 23, 199828.10+2.60Major1,660
5Nov 16, 194127.73+2.23Major1,490
6Oct 4, 200427.45+1.95Moderate1,250
7Mar 11, 194827.44+1.94Moderate1,340
8Sep 21, 201727.43+1.93Moderate1,420
9Feb 3, 197027.41+1.91Moderate1,410
10Sep 7, 200427.36+1.86Moderate1,210
11Sep 7, 195027.25+1.75Moderate1,240
12Mar 18, 196027.24+1.74Moderate1,230
13Sep 12, 196026.96+1.46Moderate1,020
14Oct 21, 195026.88+1.38Moderate1,040
15Sep 24, 194726.86+1.36Moderate1,030
16Mar 31, 194826.80+1.30Moderate1,030
17Aug 18, 197826.80+1.30Moderate1,100
18Sep 27, 200426.80+1.30Moderate887
19Mar 20, 195926.79+1.29Moderate1,020
20Oct 9, 196026.77+1.27Moderate880
21Oct 4, 194826.76+1.26Moderate974
22Mar 31, 198726.74+1.24Moderate1,010
23Jul 23, 201826.70+1.20Moderate931
24Aug 8, 196526.63+1.13Moderate985
25Jun 18, 198226.63+1.13Moderate1,000
26Jul 14, 195926.59+1.09Moderate—
27Aug 30, 196726.58+1.08Moderate960
28Sep 25, 194626.56+1.06Moderate870
29Sep 13, 195926.50+1.00Moderate—
30Nov 1, 196026.50+1.00Moderate840
31Dec 19, 194126.47+0.97Minor761
32Oct 19, 194426.42+0.92Minor800
33Aug 27, 194626.42+0.92Minor860
34Apr 3, 194226.40+0.90Minor743
35Jun 21, 195926.39+0.89Minor—
36Sep 8, 194326.37+0.87Minor775
37Jun 1, 201826.33+0.83Minor764
38Oct 29, 194626.30+0.80Minor754
39Aug 30, 196526.28+0.78Minor816
40Jul 9, 201826.28+0.78Minor744
41Aug 7, 196026.27+0.77Minor—
42Feb 25, 194226.25+0.75Minor613
43Dec 20, 201826.21+0.71Minor716
44Jun 8, 198326.20+0.70Minor788
45Feb 2, 194826.18+0.68Minor688
46Jan 20, 194226.14+0.64Minor616
47Mar 1, 196626.13+0.63Minor735
48Oct 2, 195126.12+0.62Minor655
49Apr 10, 201826.09+0.59Minor670
50Jul 29, 194626.04+0.54Minor638

Other gauges in Marion County

Flood gauges in Marion County
Eureka22.025.49 ft, Sep 13, 20179
Moss Bluff Dam44.046.85 ft, Oct 10, 20241
Conner38.040.07 ft, Sep 11, 20172
Ocala39.041.31 ft, Sep 11, 20173
Dunnellon (in NAVD88)30.030.43 ft, Nov 1, 20240
Dunnellon (in NAVD88)29.029.57 ft, Nov 2, 20240
US 41 Dunnellon (in NAVD88)28.232.20 ft, Apr 1, 19603

Marion County: every hazard · River floods across the country · Florida

NOAA National Water Prediction Service, gauge ONGF1, retrieved October 30, 2026. Stages in feet on the gauge's own datum, not elevation. Crests are as the National Weather Service lists them; preliminary values may be revised.