Sharp Mountain Creek at Old GA 5 below Ball Ground
Highest listed crest 18.67 ftFlood stage 18.0 ft2 crests since 2009
The Sharp Mountain Creek at Old GA 5 below Ball Ground crested above flood stage 2 times among the 2 crests the National Weather Service lists from 2009 to 2025. The highest, 18.67 ft on February 13, 2025, was minor flooding, 0.67 feet above flood stage.
The gauge
- Highest listed crest
- 18.67 ft
- February 13, 2025; 1,687 cubic feet per second
- Flood stage
- 18.0 ft
- Major flooding from 28.0 ft
- Crests at major
- 0
- 2 above flood stage
- Most recent flood crest
- February 13, 2025
- 18.67 ft, minor flooding
Flood stages
The thresholds the National Weather Service uses for this gauge today, and how many listed crests reached each.
| Action stage | 16.0 | 0 | — |
| Flood stage (minor) | 18.0 | 2 | Feb 13, 2025 |
| Moderate flood stage | 23.0 | 0 | — |
| Major flood stage | 28.0 | 0 | — |
Every listed crest
2 crests from 2009 to 2025. Filled: at or above flood stage. Hover a crest for its date and stage.
Crests at or above flood stage, by decade
- These are the crests the local National Weather Service office lists for the gauge: the highest on record and recent crests. Lesser floods between them may be missing, so counts by decade are a floor.
- Categories use today's flood stages. Levees, dams and channel changes since a crest can make old and new stages not directly comparable.
Highest crests
| 1 | Feb 13, 2025 | 18.67 | +0.67 | Minor |
| 2 | Sep 22, 2009 | 18.00 | 0.00 | Minor |
Other gauges in Cherokee County
| Canton | 24.87 ft, Feb 13, 2025 | 0 |
| Canton | 26.70 ft, Jan 7, 1946 | 2 |
| GA 5 near Woodstock | 20.80 ft, Sep 21, 2009 | 0 |
| Ball Ground | 14.23 ft, Sep 22, 2009 | 0 |
| GA 108 near Waleska | 14.70 ft, Feb 13, 2025 | 0 |
Cherokee County: every hazard · River floods across the country · Georgia
NOAA National Water Prediction Service, gauge BALG1, retrieved October 30, 2026. Stages in feet on the gauge's own datum, not elevation. Crests are as the National Weather Service lists them; preliminary values may be revised.