Highest listed crest 54.83 ftFlood stage 40.0 ft31 crests since 1982

The Ohio River at Smithland Lock and Dam crested at major flood stage 4 times among the 31 crests the National Weather Service lists from 1982 to 2025. The highest, 54.83 ft on May 6, 2011, was major flooding, 14.83 feet above flood stage. 8 other gauges on the Ohio River crested above flood stage within a week of it, 1 at its own highest listed crest.

The gauge

Highest listed crest
54.83 ft
May 6, 2011; 1,064,820 cubic feet per second
Flood stage
40.0 ft
Major flooding from 50.0 ft
Crests at major
4
26th of 72 gauges in Kentucky
Most recent flood crest
April 15, 2025
47.96 ft, minor flooding
Location
Livingston County
Near Paducah (13.5 mi)

Flood stages

The thresholds the National Weather Service uses for this gauge today, and how many listed crests reached each.

Flood categories, Ohio River at Smithland Lock and Dam
Action stage35.00—The level at which the NWS or its partners begin to take action
Flood stage (minor)40.026Apr 15, 2025Minimal or no property damage, but possibly some public threat
Moderate flood stage48.01Jan 8, 1991Some inundation of structures and roads near the stream
Major flood stage50.04Feb 25, 2019Extensive inundation of structures and roads

Every listed crest

31 crests from 1982 to 2025. Filled: at or above flood stage. Hover a crest for its date and stage.

Listed crests at the Ohio River at Smithland Lock and Dam, 1982 to 2025 40455055ft Flood stage 40.0 ftMajor 50.0 ft Mar 25, 1982: 40.60 ft, minor floodingMay 25, 1983: 46.40 ft, minor floodingMay 14, 1984: 47.10 ft, minor floodingMar 6, 1985: 40.20 ft, minor floodingFeb 24, 1989: 46.10 ft, minor floodingFeb 19, 1990: 45.80 ft, minor floodingJan 8, 1991: 49.80 ft, moderate floodingApr 3, 1993: 40.30 ft, minor floodingFeb 6, 1994: 41.40 ft, minor floodingMar 18, 1994: 41.30 ft, minor floodingApr 23, 1994: 45.29 ft, minor floodingMay 28, 1995: 44.00 ft, minor floodingMay 13, 1996: 44.00 ft, minor floodingMar 12, 1997: 51.44 ft, major flooding; 832,000 cubic feet per secondApr 28, 1998: 41.40 ft, minor floodingFeb 1, 1999: 43.70 ft, minor floodingMay 24, 2002: 43.00 ft, minor floodingFeb 28, 2003: 43.90 ft, minor flooding; 704,041 cubic feet per secondDec 10, 2004: 40.10 ft, minor flooding; 594,792 cubic feet per secondJan 16, 2005: 47.29 ft, minor flooding; 805,590 cubic feet per secondMar 28, 2008: 45.17 ft, minor flooding; 619,023 cubic feet per secondMay 12, 2009: 41.33 ft, minor flooding; 538,552 cubic feet per secondMay 6, 2010: 42.90 ft, minor flooding; 567,881 cubic feet per secondMay 6, 2011: 54.83 ft, major flooding; 1,064,820 cubic feet per secondMar 17, 2015: 45.22 ft, minor flooding; 620,277 cubic feet per secondMar 2, 2018: 50.14 ft, major flooding; 777,357 cubic feet per secondFeb 25, 2019: 51.83 ft, major flooding; 870,234 cubic feet per secondFeb 20, 2020: 46.59 ft, minor flooding; 657,403 cubic feet per secondMar 10, 2021: 42.37 ft, minor flooding; 557,327 cubic feet per secondMar 2, 2022: 44.04 ft, minor flooding; 590,980 cubic feet per secondApr 15, 2025: 47.96 ft, minor flooding Highest, 54.83 ft, May 6, 2011 1990200020102020

Crests at or above flood stage, by decade

Crests at or above flood stage per decade, Ohio River at Smithland Lock and Dam 1980s: 5 1990s: 11 11 2000s: 6 2010s: 5 2020s: 4 1980s1990s2000s2010s2020s
  1. These are the crests the local National Weather Service office lists for the gauge: the highest on record and recent crests. Lesser floods between them may be missing, so counts by decade are a floor.
  2. Categories use today's flood stages. Levees, dams and channel changes since a crest can make old and new stages not directly comparable.

Highest crests

Highest listed crests, Ohio River at Smithland Lock and Dam
1May 6, 201154.83+14.83Major1,064,820
2Feb 25, 201951.83+11.83Major870,234
3Mar 12, 199751.44+11.44Major832,000
4Mar 2, 201850.14+10.14Major777,357
5Jan 8, 199149.80+9.80Moderate—
6Apr 15, 202547.96+7.96Minor—
7Jan 16, 200547.29+7.29Minor805,590
8May 14, 198447.10+7.10Minor—
9Feb 20, 202046.59+6.59Minor657,403
10May 25, 198346.40+6.40Minor—
11Feb 24, 198946.10+6.10Minor—
12Feb 19, 199045.80+5.80Minor—
13Apr 23, 199445.29+5.29Minor—
14Mar 17, 201545.22+5.22Minor620,277
15Mar 28, 200845.17+5.17Minor619,023
16Mar 2, 202244.04+4.04Minor590,980
17May 28, 199544.00+4.00Minor—
18May 13, 199644.00+4.00Minor—
19Feb 28, 200343.90+3.90Minor704,041
20Feb 1, 199943.70+3.70Minor—
21May 24, 200243.00+3.00Minor—
22May 6, 201042.90+2.90Minor567,881
23Mar 10, 202142.37+2.37Minor557,327
24Feb 6, 199441.40+1.40Minor—
25Apr 28, 199841.40+1.40Minor—
26May 12, 200941.33+1.33Minor538,552
27Mar 18, 199441.30+1.30Minor—
28Mar 25, 198240.60+0.60Minor—
29Apr 3, 199340.30+0.30Minor—
30Mar 6, 198540.20+0.20Minor—
31Dec 10, 200440.10+0.10Minor594,792

The worst floods along the Ohio River

For this gauge's highest crests, the other gauges on the Ohio River that crested above flood stage within a week.

May 6, 2011: 54.83 ft here, major flooding

February 25, 2019: 51.83 ft here, major flooding

March 12, 1997: 51.44 ft here, major flooding

Gauges on the Ohio River

Flood gauges sharing the river's name, linked within 80 miles of one another.

Flood gauges on the Ohio River
AshlandKY52.074.21 ft, Jan 27, 19374
Belleville LockWV35.061.80 ft, Mar 29, 191315
CairoIL40.061.72 ft, May 2, 201119
Cannelton Lock and DamKY42.060.80 ft, Jan 27, 19378
CincinnatiOH52.066.20 ft, Mar 11, 19641
Clifty CreekIN451.0475.90 ft, Jan 27, 19371
Dashields Lock and DamPA25.042.80 ft, Mar 18, 19365
East LiverpoolWV14.029.90 ft, Mar 19, 193611
EvansvilleIN42.053.75 ft, Jan 31, 19371
GolcondaIL40.062.60 ft, Feb 2, 19373
Hannibal Lock and DamOH35.041.90 ft, Jun 25, 19722
HendersonKY36.043.08 ft, Apr 12, 20250
IrontonOH52.054.67 ft, Feb 19, 20180
J.T. Myers Lock and DamKY37.064.40 ft, Feb 1, 19371
Lloyd Greenup LockKY54.064.50 ft, Mar 31, 19133
Marietta PumphouseOH35.058.30 ft, Mar 29, 19133
Markland LowerKY51.076.10 ft, Jan 26, 19371
MaysvilleKY50.075.60 ft, Jan 27, 19372
McAlpine LowerKY55.085.44 ft, Jan 27, 19374
McAlpine UpperKY23.052.15 ft, Jan 27, 19377
Meldahl DamOH51.076.00 ft, Jan 26, 19373
Montgomery Lock and DamPA33.055.00 ft, Mar 18, 193610
MoundsvilleWV37.057.90 ft, Mar 19, 19363
Mount VernonIN35.059.21 ft, Feb 1, 19372
New Cumberland Lock and DamOH36.050.20 ft, Dec 31, 194215
Newburgh Lock and DamKY38.056.60 ft, Jan 31, 19371
Olmsted Lock and Dam HeadwaterKY36.048.20 ft, Feb 21, 20201
OwensboroKY40.054.80 ft, Jan 29, 19375
PaducahKY39.060.60 ft, Feb 2, 19377
ParkersburgWV36.045.20 ft, Mar 12, 19645
Pike Island Lock and DamWV37.047.70 ft, Mar 11, 19645
PittsburghPA22.046.00 ft, Mar 18, 193622
Point PleasantWV40.062.80 ft, Mar 30, 191325
PomeroyOH46.068.80 ft, Apr 1, 191334
PortsmouthOH50.053.78 ft, Apr 7, 20250
Powhatan PointOH37.053.30 ft, Mar 19, 19365
R C Byrd LockWV50.069.60 ft, Jan 27, 19379
Racine LockWV41.050.23 ft, Sep 20, 20043
ShawneetownKY33.065.64 ft, Jan 30, 19377
Smithland Lock and Dam this gaugeKY40.054.83 ft, May 6, 20114
SteubenvilleOH36.044.00 ft, Jan 20, 19961
Tell CityIN38.056.95 ft, Jan 29, 19376
WellsburgWV36.054.60 ft, Mar 19, 19369
WellsvilleOH11.020.90 ft, Jan 20, 19963
WheelingWV36.045.40 ft, Jan 20, 19963
Willow Island LockWV37.044.78 ft, Sep 19, 20042
HuntingtonOH50.057.52 ft, Mar 5, 19970

Livingston County: every hazard · River floods across the country · Kentucky