Tombigbee River at Stennis Lock and Dam
Highest listed crest 171.09 ftFlood stage 161.0 ft15 crests since 1982
The Tombigbee River at Stennis Lock and Dam crested at major flood stage 10 times among the 15 crests the National Weather Service lists from 1982 to 2020. The highest, 171.09 ft on December 6, 1983, was major flooding, 10.09 feet above flood stage. 3 other gauges on the Tombigbee River crested above flood stage within a week of it.
The gauge
- Highest listed crest
- 171.09 ft
- December 6, 1983; 124,000 cubic feet per second
- Flood stage
- 161.0 ft
- Major flooding from 166.0 ft
- Crests at major
- 10
- 7th of 74 gauges in Mississippi
- Most recent flood crest
- February 14, 2020
- 166.35 ft, major flooding
Flood stages
The thresholds the National Weather Service uses for this gauge today, and how many listed crests reached each.
| Action stage | 160.0 | 0 | — |
| Flood stage (minor) | 161.0 | 5 | Dec 10, 2004 |
| Moderate flood stage | 164.0 | 0 | — |
| Major flood stage | 166.0 | 10 | Feb 14, 2020 |
Every listed crest
15 crests from 1982 to 2020. Filled: at or above flood stage. Hover a crest for its date and stage.
Crests at or above flood stage, by decade
- These are the crests the local National Weather Service office lists for the gauge: the highest on record and recent crests. Lesser floods between them may be missing, so counts by decade are a floor.
- Categories use today's flood stages. Levees, dams and channel changes since a crest can make old and new stages not directly comparable.
Highest crests
| 1 | Dec 6, 1983 | 171.09 | +10.09 | Major |
| 2 | May 22, 1983 | 170.83 | +9.83 | Major |
| 3 | Dec 29, 1982 | 170.55 | +9.55 | Major |
| 4 | Apr 9, 1983 | 169.76 | +8.76 | Major |
| 5 | Dec 24, 1990 | 169.53 | +8.53 | Major |
| 6 | May 29, 1991 | 169.45 | +8.45 | Major |
| 7 | Feb 21, 1991 | 168.81 | +7.81 | Major |
| 8 | Feb 25, 2019 | 166.90 | +5.90 | Major |
| 9 | Feb 14, 2020 | 166.35 | +5.35 | Major |
| 10 | May 1, 1991 | 166.21 | +5.21 | Major |
| 11 | Dec 5, 1991 | 163.88 | +2.88 | Minor |
| 12 | Apr 2, 1988 | 162.95 | +1.95 | Minor |
| 13 | Dec 10, 2004 | 162.28 | +1.28 | Minor |
| 14 | Apr 4, 2000 | 161.94 | +0.94 | Minor |
| 15 | Apr 24, 1995 | 161.28 | +0.28 | Minor |
The worst floods along the Tombigbee River
For this gauge's highest crests, the other gauges on the Tombigbee River that crested above flood stage within a week.
December 6, 1983: 171.09 ft here, major flooding
- Demopolis Lock and DamAL · Dec 12, 1983 · 83.10 ft · Moderate
- AmoryMS · Dec 5, 1983 · 31.01 ft · Moderate
- BigbeeMS · Dec 5, 1983 · 24.23 ft · Moderate
May 22, 1983: 170.83 ft here, major flooding
- Demopolis Lock and DamAL · May 27, 1983 · 85.10 ft · Moderate
- FultonMS · May 20, 1983 · 23.00 ft · Minor
December 29, 1982: 170.55 ft here, major flooding
- AmoryMS · Dec 28, 1982 · 33.15 ft · Major
- BigbeeMS · Dec 28, 1982 · 25.73 ft · Moderate
- Aberdeen Lock and DamMS · Dec 28, 1982 · 189.50 ft · Minor · its highest
- Demopolis Lock and DamAL · Jan 4, 1983 · 74.00 ft · Minor
- FultonMS · Dec 27, 1982 · 23.70 ft · Minor
Gauges on the Tombigbee River
In USGS station-number order, which runs downstream within a river basin.
| Fulton | MS | 27.72 ft, May 27, 1991 | 0 |
| Bigbee | MS | 27.64 ft, Mar 17, 1973 | 2 |
| Amory | MS | 34.65 ft, Mar 17, 1973 | 3 |
| Aberdeen Lock and Dam | MS | 189.50 ft, Dec 28, 1982 | 0 |
| Stennis Lock and Dam this gauge | MS | 171.09 ft, Dec 6, 1983 | 10 |
| Bevill Lock and Dam | AL | 142.95 ft, Feb 23, 1991 | 12 |
| Gainesville Lock and Dam | AL | 120.74 ft, Apr 15, 1979 | 2 |
| Demopolis Lock and Dam | AL | 92.30 ft, Apr 19, 1979 | 1 |
| Coffeeville Dam | AL | 51.46 ft, Apr 22, 1979 | 8 |
| Leroy | AL | 35.89 ft, Apr 1, 1979 | 1 |
Other gauges in Lowndes County
| Columbus | 32.35 ft, Apr 14, 1979 | 15 |
Lowndes County: every hazard · River floods across the country · Mississippi
NOAA National Water Prediction Service, gauge CBUM6, retrieved October 30, 2026. Stages in feet on the gauge's own datum, not elevation. Crests are as the National Weather Service lists them; preliminary values may be revised.