The Dan River at South Boston crested above flood stage 99 times among the 144 crests the National Weather Service lists from 1928 to 2025. The highest, 33.37 ft on June 24, 1972, was moderate flooding, 11.37 feet above flood stage. 2 other gauges on the Dan River crested above flood stage within a week of it, 2 at their own highest listed crest.
The thresholds the National Weather Service uses for this gauge today, and how many listed crests reached each.
Flood categories, Dan River at South Boston
Action stage
18.0
45
Sep 29, 2024
The level at which the NWS or its partners begin to take action
Flood stage (minor)
22.0
85
Jul 7, 2025
Minimal or no property damage, but possibly some public threat
Moderate flood stage
29.0
14
Nov 15, 2020
Some inundation of structures and roads near the stream
Major flood stage
34.0
0
—
Extensive inundation of structures and roads
03
Every listed crest
144 crests from 1928 to 2025. Filled: at or above flood stage. Hover a crest for its date and stage.
Crests at or above flood stage, by decade
These are the crests the local National Weather Service office lists for the gauge: the highest on record and recent crests. Lesser floods between them may be missing, so counts by decade are a floor.
Categories use today's flood stages. Levees, dams and channel changes since a crest can make old and new stages not directly comparable.
2 crests measured on an earlier gauge datum are left out: 24.50 ft on May 23, 1901; 23.50 ft on Mar 24, 1903.
04
Highest crests
The 50 highest of 144 listed crests.
Highest listed crests, Dan River at South Boston
1
Jun 24, 1972
33.37
+11.37
Moderate
—
2
Sep 8, 1996
33.22
+11.22
Moderate
—
3
Apr 18, 1987
32.57
+10.57
Moderate
—
4
Aug 16, 1940
31.80
+9.80
Moderate
81,000
5
Apr 28, 1978
31.47
+9.47
Moderate
—
6
Oct 13, 2018
31.40
+9.40
Moderate
51,000
7
Sep 24, 1979
30.67
+8.67
Moderate
—
8
Feb 9, 2020
30.56
+8.56
Moderate
47,300
9
Sep 20, 1945
30.50
+8.50
Moderate
68,000
10
Mar 23, 2003
30.34
+8.34
Moderate
44,100
11
Apr 27, 2017
30.25
+8.25
Moderate
50,400
12
May 24, 2020
30.11
+8.11
Moderate
45,400
13
Mar 31, 1975
29.77
+7.77
Moderate
—
14
Nov 15, 2020
29.44
+7.44
Moderate
42,700
15
Mar 6, 1993
28.80
+6.80
Minor
—
16
Jan 21, 1936
28.50
+6.50
Minor
51,000
17
Oct 23, 1990
28.27
+6.27
Minor
—
18
Apr 30, 1994
28.26
+6.26
Minor
—
19
Oct 22, 1937
28.25
+6.25
Minor
48,600
20
Jun 30, 1995
28.24
+6.24
Minor
—
21
Nov 14, 2009
27.50
+5.50
Minor
41,645
22
Apr 13, 2003
27.36
+5.36
Minor
—
23
Jan 30, 1998
27.34
+5.34
Minor
—
24
Oct 4, 1989
27.33
+5.33
Minor
—
25
Feb 26, 2019
27.32
+5.32
Minor
34,738
26
May 1, 1997
27.23
+5.23
Minor
—
27
Mar 4, 1994
27.07
+5.07
Minor
—
28
Jan 3, 2007
27.06
+5.06
Minor
35,896
29
Sep 20, 2018
27.06
+5.06
Minor
33,870
30
Oct 4, 1929
27.03
+5.03
Minor
40,000
31
Jan 12, 2024
26.89
+4.89
Minor
33,200
32
Apr 25, 1992
26.54
+4.54
Minor
—
33
Oct 20, 1932
26.53
+4.53
Minor
33,500
34
Dec 31, 1958
26.30
+4.30
Minor
—
35
Nov 15, 2018
26.05
+4.05
Minor
30,400
36
Aug 14, 1928
25.80
+3.80
Minor
31,800
37
Oct 5, 2015
25.80
+3.80
Minor
29,477
38
Sep 26, 1947
25.70
+3.70
Minor
32,000
39
Dec 27, 2015
25.68
+3.68
Minor
29,000
40
May 19, 2018
25.58
+3.58
Minor
28,900
41
Mar 26, 1993
25.54
+3.54
Minor
—
42
Apr 19, 1998
25.40
+3.40
Minor
—
43
Oct 1, 2004
25.19
+3.19
Minor
—
44
Dec 17, 2018
25.13
+3.13
Minor
27,500
45
Dec 23, 2018
24.99
+2.99
Minor
27,000
46
Jan 21, 1996
24.89
+2.89
Minor
—
47
Feb 19, 1998
24.85
+2.85
Minor
—
48
May 9, 1998
24.85
+2.85
Minor
—
49
Feb 25, 2003
24.74
+2.74
Minor
—
50
Jan 7, 1992
24.61
+2.61
Minor
—
05
The worst floods along the Dan River
For this gauge's highest crests, the other gauges on the Dan River that crested above flood stage within a week.
June 24, 1972: 33.37 ft here, moderate flooding
WentworthNC · Jun 22, 1972 · 31.60 ft · Major · its highest
PacesVA · Jun 23, 1972 · 33.15 ft · Moderate · its highest
September 8, 1996: 33.22 ft here, moderate flooding
NOAA National Water Prediction Service, gauge SBNV2, retrieved October 30, 2026. Stages in feet on the gauge's own datum, not elevation. Crests are as the National Weather Service lists them; preliminary values may be revised.